|
|
||||
|
Energy Management |
|
48MW BioMass Waste to Energy |
|
New Biodiesel Production Facility
Arkansas

Perigon provided selected Process, Instrumentation, and Mechanical engineering and design services for a new 40MM gallon per year Biodiesel Plant which was scheduled for start-up and commissioning in September of 2007. Other Perigon services included:
- Preparation of equipment, and tank specifications for Methanol, Catalyst, and Biodiesel Product Storage Tanks and pump sizing
- Instrument Selection and Specification
- P&ID and PFD Development
- General Layouts
- Input to Detailed Installation and Commissioning Plan
- Electrical Code Review on non-US-made Equipment





